Draft guidance · signed-in interface checks recorded; complete workflow review pending
Summary: Record expected effort separately from actual time and calendar duration.
Dependencies
Confirm the task, its current workflow state, and whether the displayed figure includes effort from child tasks.
In the expanded task editor, initial effort is shown for Idea and Backlog state types; remaining effort is shown outside Backlog. Your workflow may display different names for those state types. A missing field can therefore reflect the state rather than a missing permission.
Where the editor reports effort from children tasks, distinguish that contribution from the task's own estimate. Change the relevant task's own value, then inspect the combined total. If an edit is needed after planning, ask the responsible manager about the permitted workflow or correction process.
For a monetary amount, use Task Budgets; budget editing has its own state restriction.
Choose an estimate
Use Estimated Hours for an effort estimate and Story Points for the relative scale your team uses. They answer different questions. Two tasks can take the same elapsed week while requiring very different amounts of work.
Enter or revise an estimate
- Open the task's creation or edit form. Expand Show more fields where needed.
- Enter the estimated effort and, if your team uses points, select the agreed point value.
- Add the assumptions, exclusions, or uncertainty to the description or Wall.
- Save, then inspect the task in its project context.
When work is broken into child tasks, check how the displayed totals include the parent and its children before adding another estimate at the parent level. Use one consistent convention within the team to avoid counting the same work twice.
Recording actual time does not make the original estimate accurate. Compare estimate and actuals to improve the next plan; explain significant scope changes rather than silently rewriting history.
An estimate is blocking To Work
Open the question-mark control beside the task's workflow buttons, when shown. If it says “set estimates,” save the required effort estimate, then reopen the record and recheck the action.
A parent's total can include its children's estimates. In the signed-in practice check, saving an estimate on the child satisfied the estimate requirement on both the child and its project; adding another copy at the parent would have counted the effort twice. A separate message to “switch parent to proper workflow state” still required the parent's eligible decision maker to act. Follow A child task cannot move to Work.