Working with Tasks

Record and Correct Work Time

Draft guidance · signed-in interface checks recorded; complete workflow review pending

Summary: Log actual work against the correct task and keep it separate from estimates and appointments.

Record time after work occurs, or use the timer while doing the work. An estimate describes expected effort; an appointment allocates time; a work log records actual work. Check these separately.

Dependencies

Before recording actual work, confirm Author or higher creation access on the task's program. Membership and task assignment alone do not establish this permission. A visible work-log editor can still return Access denied; use Record opens, but Post is denied.

Then check:

  1. Confirm your task assignment. The standard task work-log entry path requires you to be an assignee under a program role. If needed, complete Assigning People to Tasks.
  2. Check the working state. New work logs are rejected on an inactive task. The displayed name of the working state varies with the configured workflow. Some workflows do not include a working state; see Check time-recording support.
  3. Use the actual date and duration. Work extending into a future date is rejected. A planned appointment is not actual work.
  4. Check the operational period for the work date. An administrator must create and open a period that covers the date. A missing, unopened, locked, posted, or closed period can reject the entry or correction; follow Operational-period restrictions.
  5. Check the timecard. An approved or closed timecard restricts changes to its entries. Use Timecards for period review and correction.

The relevant messages include “You should be in assignees to leave work logs,” “You can't log work into inactive task,” and “You can't log work for approved or closed time card.” Resolve the named condition with the task or time-record owner, then return to this task. Do not add a duplicate entry elsewhere to work around the restriction.

Dependency tree

Resolve the conditions for this task before adding actual work. An appointment by itself does not satisfy these requirements.

Check current prerequisites

Where the Help Practice preview is enabled, open the task and select Check what’s required → Record work time. Enter the actual work start in the displayed account time zone and the duration in minutes, then select Check now.

The result checks program access to create work entries, your named task assignment, the task’s working state, the actual date, the operational period, and the matching timecard. These checks concern a new task work entry for your own account. Corrections, special role-based entries, and a complete entry split across midnight need their normal controls and validation.

Instructions and dependencies opens the relevant help section in a new tab. Return to the task after correcting setup; the preview refreshes when the window regains focus. Changing a field clears the old result. Select Check again whenever you need a fresh result.

The check saves no time, creates no timecard, and takes no workflow decision. A ready result is not a guarantee that a later save will succeed: save through the ordinary work-entry controls and reopen the resulting entry.

Log work from the Wall

  1. Open the task you worked on and select Wall.
  2. If the comment editor offers a work-log icon, select it to show the time controls. Work logging is offered only when your account and task context allow it.
  3. Enter the actual duration in the time field, such as 30m for a half-hour of work, and describe what you did in Comment. If an assignment selector appears, choose the assignment that the work belongs to.
  4. Select Post.
  5. Read the response. If Post returns an error, keep the intended duration and comment while resolving the named condition. A filled editor is not a saved work log.
  6. After a successful save, reopen the task and inspect its Time tab. Check the task, duration, and date before treating it as complete.

Example: After reviewing a requirement for half an hour, record 30m with “Checked the empty-email and valid-email cases; results attached.” The entry records your work. It does not automatically approve the requirement.

Correct an entry

Open the work log's edit control. In Work Log, check the displayed Task, change the effort, and enter the required Comment explaining the correction. Select Change, then reopen the entry and inspect the task's Time tab or your own profile → Time for the same week. Confirm the corrected duration and explanation on the existing entry.

The edit form can show decimal hours while the time list shows minutes: 0.1h = 6m. Read the unit before changing the value. A correction from 5m to 6m should leave one six-minute entry, not two entries.

The operational period must also permit the correction. Approved or closed timecards restrict changes. Locked work logs cannot be deleted, and work logs cannot be deleted from a closed task. If a control is absent or the change is rejected, retain the correct duration and reason for the responsible reviewer. Use the permitted timecard correction process; do not add a second full entry to conceal the original error.

Before submitting a time card

Check that timers are stopped when work ends or switches tasks, and review the week's entries for omissions and duplicates. See Timecards for period review. A calendar appointment is not proof that actual work has been recorded correctly.