Scheduling and Time: What Must Be Ready
Draft guidance · checked against application source; instance walkthrough pending
Summary: Use separate prerequisite trees for appointments, actual work, and corrections.
Choose the tree for your action. Booking planned time and recording actual work are separate paths; a saved appointment does not establish that a work log can be added or corrected.
Read from the action outward: indented branches show what must be ready for the item above. All means every listed condition applies; only if marks a conditional branch. Open a linked item for its full requirements and instructions. These trees show prerequisites, not automatic completion of the next action.
Before booking an appointment
Open Using Appointments — Dependencies for the scheduling, past-date, duration, and closed-task conditions.
Before recording actual work
Open Record and Correct Work Time — Dependencies for the entry conditions and messages.
Before closing or correcting
- Close an appointment: active timer and closing requirements.
- Correct or delete a work log: locked entries and closed tasks.
- Correct an approved or closed card: Timecards — Dependencies.